Jun 092013
 

I’ve been working really hard on the garage over the last couple of days.

I had made a start on the left hand wall in March by building some window frames, and plasterboarding the lower parts of the wall:

Window Frame

Window Frame

Today, I have pretty much finished plasterboarding the left hand wall and window, apart from some beading that needs doing around the windows. This means I’m now 95% done 🙂

The ceiling, left, right, and top walls are all boarded. I just need to finish the boarding at the walls near the entrance, but only one side can be done at this stage until the the electrical work is completed:

Plasterboard 09/06/2013

Plasterboard 09/06/2013